Forum Role: Participant
Active Since: March 4, 2020
Topics Started: 0
Replies Created: 1

Forum Replies Created

Viewing 1 post (of 1 total)
  • Adam
    Participant
    I plan to use a rubric to evaluate the student projects.  I will make an excel sheet that shows how the points will be distributed for each section of the report and allow students to use the rubric as a checklist.  Students will have a peer review period before handing in their projects and there will be additional time to make revisions based on peer feedback.
Viewing 1 post (of 1 total)